01
Full Home Renovation
Strip-out to handover: wet works, ceilings, flooring, carpentry, paint. One contract, one site lead, one fixed price.
Mahir Works · Design & Build · Subang Jaya · Est 2012
Fixed-price renovation, delivered on schedule. No variation-order games, no disappearing contractor.
12 YRS
On site since 2012
380+
Projects delivered
CIDB G4
Registered contractor
RM 28M
Work delivered

USJ 11 · Full home · 14 weeks
Fig. 01
02 · Services
Real ranges, posted up front. If your budget and ours don't match, we'll tell you at the site visit — not at week six.
01
Strip-out to handover: wet works, ceilings, flooring, carpentry, paint. One contract, one site lead, one fixed price.
02
Hacking, waterproofing with a ponding test, tiling, cabinetry and tops. The two rooms that sink most renovations, done right.
03
Shoplots, clinics, F&B and offices. Bomba compliance, authority sign-offs, and a handover date your opening can depend on.
04
Kitchen extensions, room additions, slab and beam work. Engineered drawings, proper piling, neighbour-proof site management.
05
Full rewiring, DB upgrades, new points, plumbing reruns. Certified electricians; every circuit tested and tagged at handover.
06
Space planning, 3D views and permit drawings, handled by us when we build. We don't sell drawings — we build them.
Ranges from 380 completed projects, 2012–2026. Your line-by-line quote is fixed before we start.
03 · Work
Drag the line. An SS15 terrace we gutted and rebuilt — same room, same angle, twelve weeks apart.
After
BeforeSS15 TERRACE1,900 SQFTRM 142KHANDED OVER 3 DAYS EARLY
Drag to compare
04 · Process
Four steps, each with a date on it. You always know what happens next, and what it costs.
WITHIN 48H · FREE
We walk the site, measure everything, and listen to what you actually want. No charge, no obligation — slots within 48 hours.
5 WORKING DAYS
Every item priced: materials, labour, debris, even the skip bin. What you sign is what you pay.
WKS 1–12
You get a WhatsApp group with the site lead. Photos every Friday, decisions answered the same day.
FINAL WEEK
We clear the defects list before final payment, not after. Then we stand behind the work for 24 months.
One rule on price: it only moves if you change the scope. Never because we mis-measured.
05 · Proof
92%
of projects handed over on or before schedule.
350 of 380 projects · 2012–2026 · the other 30, we paid for the delay
“They told me the price before we started, and that was the price at the end. I didn't think contractors like this existed.”
“Weekly photos meant I never had to drive over to check. The WhatsApp group answered everything the same day.”
“Our shop opened on the Monday we planned six months earlier. In F&B, that is the whole game.”
06 · Contact
Site visit itemised quote you decide
Bring your floor plan if you have one.
Mahir Works Sdn Bhd
23, Jalan USJ 9/5, Subang Jaya · CIDB G4 · Insured to RM 2M
● Like Mahir Works? Yours, in days.
Pick Forge, send us your brief, and we build your version in 2-3 days. RM 399 a year if you keep it. Walk away if not.
Start with ForgeNo card · No long sales call