Mahir Works · Design & Build · Subang Jaya · Est 2012

We buildWhat we quote.

Fixed-price renovation, delivered on schedule. No variation-order games, no disappearing contractor.

12 YRS

On site since 2012

380+

Projects delivered

CIDB G4

Registered contractor

RM 28M

Work delivered

Renovated open-plan interior by Mahir Works — USJ 11 full home project

USJ 11 · Full home · 14 weeks

Fig. 01

02 · Services

What we take on.

Real ranges, posted up front. If your budget and ours don't match, we'll tell you at the site visit — not at week six.

01

Full Home Renovation

Strip-out to handover: wet works, ceilings, flooring, carpentry, paint. One contract, one site lead, one fixed price.

RM 80–250K10–16 WKS

02

Kitchen & Wet Works

Hacking, waterproofing with a ponding test, tiling, cabinetry and tops. The two rooms that sink most renovations, done right.

RM 25–80K4–8 WKS

03

Commercial Fit-Out

Shoplots, clinics, F&B and offices. Bomba compliance, authority sign-offs, and a handover date your opening can depend on.

RM 50–300K6–12 WKS

04

Extensions & Structural

Kitchen extensions, room additions, slab and beam work. Engineered drawings, proper piling, neighbour-proof site management.

RM 60–200K8–14 WKS

05

M&E & Full Rewiring

Full rewiring, DB upgrades, new points, plumbing reruns. Certified electricians; every circuit tested and tagged at handover.

RM 8–40K2–4 WKS

06

Design & Authority Submission

Space planning, 3D views and permit drawings, handled by us when we build. We don't sell drawings — we build them.

INCLUDEDWITH EVERY BUILD

Ranges from 380 completed projects, 2012–2026. Your line-by-line quote is fixed before we start.

03 · Work

Same house. Twelve weeks.

Drag the line. An SS15 terrace we gutted and rebuilt — same room, same angle, twelve weeks apart.

After — the same room finished: warm, renovated interior at handoverAfter
Before — the bare room at strip-out, unfinished walls and floorBefore

SS15 TERRACE1,900 SQFTRM 142KHANDED OVER 3 DAYS EARLY

Drag to compare

04 · Process

No surprises, by design.

Four steps, each with a date on it. You always know what happens next, and what it costs.

  1. WITHIN 48H · FREE

    Site visit & measure

    We walk the site, measure everything, and listen to what you actually want. No charge, no obligation — slots within 48 hours.

  2. 5 WORKING DAYS

    Fixed quote, line by line

    Every item priced: materials, labour, debris, even the skip bin. What you sign is what you pay.

  3. WKS 1–12

    Build, with weekly photo updates

    You get a WhatsApp group with the site lead. Photos every Friday, decisions answered the same day.

  4. FINAL WEEK

    Handover + 24-month warranty

    We clear the defects list before final payment, not after. Then we stand behind the work for 24 months.

One rule on price: it only moves if you change the scope. Never because we mis-measured.

05 · Proof

On paper, and on site.

  • CIDB G4
  • SSM REGISTERED
  • INSURED RM 2M
  • 24-MO WARRANTY

92%

of projects handed over on or before schedule.

350 of 380 projects · 2012–2026 · the other 30, we paid for the delay

They told me the price before we started, and that was the price at the end. I didn't think contractors like this existed.
Lim S.Y.KITCHEN, SS15 · RM 38K
Weekly photos meant I never had to drive over to check. The WhatsApp group answered everything the same day.
Farhana M.FULL HOME, USJ 11 · RM 186K
Our shop opened on the Monday we planned six months earlier. In F&B, that is the whole game.
Daniel TanCAFE FIT-OUT, SS13 · RM 94K

06 · Contact

Get your quote in five days.

Site visit itemised quote you decide

Bring your floor plan if you have one.

Mahir Works Sdn Bhd

23, Jalan USJ 9/5, Subang Jaya · CIDB G4 · Insured to RM 2M

Like Mahir Works? Yours, in days.

We will adapt this template to your brand — free.

Pick Forge, send us your brief, and we build your version in 2-3 days. RM 399 a year if you keep it. Walk away if not.

Start with Forge

No card · No long sales call

← Back to all templates·Forge, inspired by a site office & Dieter Rams